Engineer, contractor, and closeout, managed for the board.
Runoff had eroded the slope around an HOA's stormwater outlet structure. We ran the repair for the association from design through completion.
- Engineering. We brought in a hydrology engineering firm to design the repair.
- Scope. We turned the design into a scope of work.
- Contractor. We selected the contractor.
- Managed the work. We oversaw the excavation, pipe, and riprap against the engineer's design.


